FIRE PROTECTION SYSTEM PERMITS

FIRE PERMITS

Community Fire Protection District requires a permit for the installation, modification, or removal of fire protection systems and fuel storage tanks within the district. Fire permits must be reviewed and approved before work begins.

Fire permits are a separate permit category from building permits. If your project also includes commercial construction, a remodel, or a tenant finish, you will need a Commercial Building Permit in addition to the fire permit or permits below.

APPLY FOR A FIRE PERMIT

ONE PERMIT PER SYSTEM

Each fire protection system requires its own application. A build-out with both sprinklers and a fire alarm needs two fire permits:

  • A Fire Sprinkler System permit, and

  • A Fire Alarm System permit

Each application has its own plan set and its own review. All of your applications can be started from the same portal account and will appear together on your dashboard.

Apply online through our Permit Portal

All online permit applications are now submitted through the Community Fire Protection District Permit Portal. Use the portal to create an account, complete the application, upload plans in PDF format, and track the status of your permit.

Before You Apply…Collect the Following

  • Project address

  • Scope of Work

  • Building Owner Information*

  • Contractor Information*

  • Architect/Engineer Information*

  • Estimated cost of the fire protection work

  • Digital plan set ready for upload (pdf format required)

    • Ensure plans are designed to the 2021 I-codes and the applicable NFPA standards.

  • Supporting documents if required — cutsheets, calculations, and certificates.

*Name, mailing address, email, and phone number required.

These applications are for fire protection system and fuel storage tank work within the district. Commercial construction is permitted separately under Building Permits.

How it works

  1. Create a portal account or sign in.

  2. Select Fire Permits as the permit category, then select the permit type that matches your scope of work.

  3. Complete the application and upload the required plans and documents.

  4. Submit the application through the portal.

  5. District staff will review the submittal and assess fees.

  6. Pay fees through the portal or in person when notified.

  7. Respond to review comments in the portal if revisions are requested.

  8. Work may begin only after permit approval and issuance.

WHICH FIRE PERMIT DO I NEED?

Select the permit type below that matches your scope of work. Each one is a separate application in the Permit Portal. If your project includes more than one system, submit a separate application for each — a project with both a sprinkler system and a fire alarm system needs two fire permits.

Permit TypeUse this permit forPlans and documents to have ready
Fire Alarm SystemNew fire alarm systems, control panel replacements, and additions or modifications to an existing system.Fire alarm plans and equipment cutsheets are both required. Have your input/output matrix or sequence of operation included in the plan set.
Fire Sprinkler SystemNew sprinkler systems, sprinkler additions, and modifications to an existing system, including work in newly built-out space.Sprinkler plans are required. Hydraulic calculations, a signed owner's certificate, cutsheets, and contractor's material and test certificates may also be uploaded. Know the edition of NFPA 13 used, the system type, and the occupancy hazard classification before you start.
Commercial Hood / Suppression SystemNew or replacement commercial kitchen hoods, wet chemical suppression systems, and tie-ins to the kitchen gas shutoff.Hood and suppression plans are required; cutsheets and records of inspection and testing are optional. You will be asked whether the permit covers the hood, the suppression system, or both.
Alternative Fire Protection SystemClean agent, dry chemical, and other non-sprinkler suppression systems — for example, in server rooms or electrical rooms.Fire protection system plans are required; cutsheets and records of inspection and testing are optional.
Above / Below Ground Fuel Tank (Install or Remove)Installation or removal of above-ground or below-ground fuel storage tanks, including generator fuel tanks.Construction plans that include a site plan and equipment cutsheets are required. Missouri DNR approvals may also be uploaded.
LP TankInstallation of above-ground or below-ground LP (propane) tanks.A site plan and construction plans are required. Have the tank capacity and clearance and setback distances available.
Underground Fire MainNew or replacement underground fire mains, including connections to the public water supply serving private hydrants or sprinkler systems.A site plan and construction plans are required; contractor's material and test certificates are optional.

Permit Requirements

Important NotesRequirements and Next Steps
Building PermitsA fire permit does not replace a Commercial Building Permit. Projects involving new construction, remodels, or tenant finishes require a building permit as well.
Municipal PermitsApplying to Community Fire Protection District does not replace permit requirements of the municipality having jurisdiction. Applicants may also need to apply for permits with the applicable municipality.
Permit FeesPermit fees are due before permit issuance. Permit fees may be paid by check, debit card, or credit card. Credit and debit card payments are subject to a 3% surcharge with a $2.00 minimum. Electronic check (e-check) payments are subject to a flat $2.00 fee.
Digital PlansDigital plans must be uploaded in PDF format. Before uploading, save files using the construction address as the file name. Example: 9411 Marlowe.pdf
InspectionsMost fire permits require one or more inspections. Fire sprinkler system permits require several, including rough-in and final acceptance testing. The inspections required for your permit are listed in your application in the portal.
Before Work BeginsPlan review must be approved, all applicable fees must be paid, and the permit must be issued before installation work begins.
What Happens Next?After submittal, Fire Marshal's Office staff will review the application and plans. Applicants will be notified through the Permit Portal if additional information, revisions, or fees are required.
ITM ReportsRoutine inspection, testing, and maintenance (ITM) reports for existing systems are not submitted through the Permit Portal. Service providers submit ITM reports through The Compliance Engine.

Need help using the Permit Portal?

If you need help creating your account, starting an application, uploading documents, or checking permit status, contact the Fire Marshal’s Office at (314) 428-1128 or firemarshal@communityfpd.org. Please include the project address and permit number, if available, in your message.

After you create an account, watch for email messages from noreply@smartgovcommunity.com and check your spam or junk folder if you do not see the confirmation email.

FIRE PERMIT FAQS